El Tule Colony
San José del Cabo, B.C.S.
11-22%
Annual Preferred Return
8%
Estimate Holding Period
3-4 Years
Capital Required
$4,000,000 USD
CASE STUDY
Location
Building
Trend
Concept
Timeline
Team
THE FACILITIES
- 24 condos averaging 1,400sq. ft each in 4 buildings
- 3 Bedrooms (one bedroom with lock off and kitchenette)
- 2 Bathrooms
- Living room
- Full kitchen
- Terrace
- 4 Penthouses with roof top
- 7 retail spaces (pharmacy, deli, dry cleaner, activity center, coffee shop, storage)
- Pool (1,500 sqf)
- Self service area
43,000
24
7
Location
Located between San Jose del Cabo and Los Cabos. This development will occupy a fantastic address, located steps from the burgeoning, 7 new 5 star hotels.
Located between San Jose del Cabo and Los Cabos. This development will occupy a fantastic address, located steps from the burgeoning, 7 new 5 star hotels.
Use the Google Streetview tools on the right to view the location of the property
Please note that the images captured on Google Street View are not current and they do not represent the latest status of the project
- El Pedregal
- Cabo Wabo
- Los Cabos Arch
- Todos Santos
- Los Barriles
- Palmilla
- Koral Center
- Puerto Paraiso
- Marina Puerto Los Cabos
- Chileno Bay
CONCEPT
The “live-work-play” lifestyle is a growing priority for renters, and mixed-use developers are responding with designs and amenities that set their community apart from the rest. Meeting this demand we Introduce EL TULE COLONY, 24 condos in 4 building with a stunning 4 rooftop terraces in each building, over 3,000 square feet of retail space at street level and one of the town trendiest urban architecture, this is set to be a modern and striking addition to a high-energy pocket that’s been seeing unprecedented growth.
Located between San Jose del Cabo and Los Cabos. This development will occupy a fantastic address, located steps from the burgeoning, 7 new 5 star hotels.
TREND
01
02
03
INVESTMENT TIMELINE
2016
option to purchase the land
2017
closing the land
2018
arquitectural project and permits
2019
campaign begins
2019
construction begin
2021
operations begin
2022